Holtec

ACTIVENRC LICENSING
Active Projects
UK Cottam Project — Data Center + SMR-300 (with EDF UK + Tritax)
MOU + GDA STEP 2 CLEARED
REACTOR TYPE
SMR-300 fleet (multiple units; 50 Hz international variant)
TARGET DATE
NaN
LOCATION
Cottam, Nottinghamshire, England (former coal-fired power station, "Megawatt Valley")
CUSTOMER
1 GW data center campus operator (TBD — Tritax-led real estate)

September 15, 2025 — MOU signed between Holtec, EDF UK, and Tritax Management ahead of Trump's UK State Visit. 900-acre former coal site converted into clean energy + AI infrastructure hub. 150 acres for data centers; 100 acres for SMRs. $15B project value. Initial renewable energy backing; SMR-300s online 2030s. Site is part of the Trent Valley Supercluster — submitted as an AI Growth Zone to UK Government. Foreign investment commitments: Framatome (nuclear fuel fabrication + services) and Arabelle Solutions (turbines). UK GDA Step 2 successfully completed early 2026 (key de-risking milestone).

HI-STORM / HI-STAR — Spent Fuel Storage + Transport
OPERATIONAL (CASH-FLOW BUSINESS)
CUSTOMER
US LWR fleet + international growing

Holtec's foundational business — dominant US dry storage cask provider. HI-STORM systems for on-site dry storage; HI-STAR transport casks for spent fuel movement. Key cash-flow business (~$500M annual revenue together with decommissioning). 2025 milestone: international dry storage bookings surpassed domestic for the first time in new sales — Holtec is now globally dominant in this category. Underwrites the entire Holtec capital structure for SMR-300 development.

Holtec Decommissioning International (HDI)
ACTIVE (4 SITES)
CUSTOMER
Decommissioning customers (former utility owners) + future restart customers

Wholly-owned subsidiary launched 2018 to acquire shuttered reactor sites for decommissioning. Current portfolio: Palisades MI (now restarting!), Indian Point NY, Pilgrim MA, Oyster Creek NJ. Strategic pivot: Palisades demonstrated that "decommissioning sites" can be re-evaluated for restart with proper economics. Triggered industry-wide rethinking — Duane Arnold (NextEra) now also targeting restart.

Hyundai E&C Alliance — 10 GW SMR-300 Fleet Target (North America)
STRATEGIC ALLIANCE (ACTIVE EPC FOR PIONEER 1+2)
10000 MWe
REACTOR TYPE
SMR-300 fleet (~33 units = 10 GW)
TARGET DATE
NaN
LOCATION
Multiple North American sites (TBD)
CUSTOMER
Various utility + industrial customers

Strategic alliance signed 2022, expanded to full EPC partnership February 2025. Goal: build 10 GW fleet of SMR-300s in North America through the 2030s following the first-of-a-kind Pioneer Units 1+2 at Palisades. Hyundai E&C is uniquely qualified — completed UAE Barakah complex (4 reactors) on schedule, the largest commercial nuclear build of the past decade. Hyundai planned to complete site design Q2 2025 and begin construction "around the end of [2025]" — referring to Pioneer 1+2 specifically.

Palisades Restart — First-Ever US Nuclear Restart
RESTART IN PROGRESS (PASSIVATION COMPLETED APRIL 2026; AWAITING GRID SYNC)
805 MWe
REACTOR TYPE
Existing 805 MWe Pressurized Water Reactor (originally commissioned 1971)
TARGET DATE
2026
LOCATION
Covert Township, Michigan (Lake Michigan shore)
CUSTOMER
Wolverine Power Cooperative (528 MW / two-thirds offtake) + Hoosier Energy (balance)
DOE SUPPORT
DOE Loan Programs Office: up to $1.52B conditional loan commitment

Historic first commercial nuclear plant restart in US history. Acquired from Entergy in 2022 originally for decommissioning; Holtec reversed course and pursued restart. NRC approved status change from decommissioning to operating in 2025 (regulatory first). Long-term PPA structure: Wolverine Power Cooperative purchases two-thirds (528 MW); Hoosier Energy purchases balance — both serving Indiana and Michigan electric cooperatives. Multiple schedule slips: original end-2025 → late Feb 2026 → still pending as of April 2026. April 2026 milestone: passivation completed (chemical process improving corrosion resistance). Sets precedent: Duane Arnold (NextEra) targeting late 2028/early 2029 restart; broader US fleet may follow.

Pioneer Units 1 + 2 — Palisades SMR-300
NRC CPA PART 1 UNDER REVIEW (FILED END OF 2025)
680 MWe
REACTOR TYPE
SMR-300 (2 units = 680 MWe at 340 MWe per unit)
TARGET DATE
NaN
LOCATION
Palisades Energy Center, Covert Township, MI (adjacent to restarting Palisades plant)
CUSTOMER
Likely PPA structure aligned with Palisades restart (Wolverine + Hoosier offtaker baseline)
DOE SUPPORT
DOE Tier 1 First Mover Award $400M (Dec 2025) + DOE ARDP Risk Reduction (2020)

First-of-a-kind SMR-300 deployment globally. CPA Part 1 (Limited Work Authorization package) submitted to NRC end of 2025; Holtec requested approval by December 31, 2026 to begin preparatory civil construction. NRC review timeline up to 18 months. Total capacity 680 MWe (340 per unit). Construction completion targeted early 2030s. Holtec uses "one-stop-shop" deployment model: technology vendor + supply chain + constructor + operator + merchant. EPC: Hyundai E&C (full partnership signed Feb 2025). Control systems: Mitsubishi Electric (Kobe + Pittsburgh).

SMR-300 — Technology Platform
PRE-LICENSING (NRC + UK GDA STEP 2 CLEARED EARLY 2026)
300 MWe
REACTOR TYPE
Generation III+ Pressurized Water Reactor — Small Modular Reactor
COOLANT
Light water
FUEL
Standard low-enriched uranium

Holtec's flagship SMR — 300 MWe / 1,050 MWt PWR. Walk-away safe via gravity-driven safety systems (recently enhanced with forced flow capability overlaid on the gravity-driven primary loop). 14+ years of in-house development. Installation: each two-unit set occupies less than 30 acres. UK regulatory milestone: UK Generic Design Assessment (GDA) Step 2 successfully completed early 2026. UK design adaptations align SMR-300 to 50 Hz AC frequency (used in most of the world outside North America) — facilitates global adoption.

Funding Intelligence
DOE ARDP — Risk Reduction TrackSelected (specific amount confidential)
Q4 2020

2020 DOE Advanced Reactor Demonstration Program Risk Reduction for Future Demonstrations track award. Foundational federal partnership for SMR-300 commercial readiness — predates and underpins the December 2025 Tier 1 First Mover Award.

DOE Loan Commitment — PalisadesUp to $1.52B
Q1 2024

US Department of Energy Loan Programs Office conditional loan commitment for the Palisades Nuclear Plant restart. Largest DOE loan commitment for a nuclear restart in history. Critical de-risking capital that enabled the first-ever US commercial reactor restart.

DOE Tier 1 First Mover Award (Generation III+ SMR Pathway)$400M (matching cost-share)
Q4 2025

Generation III+ Small Modular Reactor Pathway to Deployment Program — Tier 1 "First Mover Team Support" award. $400M milestone-based cost-share for licensing, pre-construction, and supply-chain mobilization for the Palisades SMR-300 (Pioneer Units 1+2) project. Announced December 2, 2025.

Company Snapshot
CEO
Dr. Kris Singh
Last Round
$400M (matching cost-share)
Q4 2025
Funding Stage
Private (planning 2026 IPO window)
Founded
1986
HQ
Camden, USA
Target Date
NaN
Customer
1 GW data center campus operator (TBD — Tritax-led real estate)
2024 Revenue
$500M