CORIUMNuclear Regulatory Intelligence
Live Data
← CORIUM
BWXT
FOUNDED
2015
HQ
Lynchburg, VA
TYPE
Public
TICKER
NYSE: BWXT
Also tracked in: MICROREACTOR · FUEL
LOADING MARKET DATA…
NRC ADVANCED REACTOR CIRCUIT
PRE-APPLICATION ENGAGEMENT
HOLDING POSITIONLast activity: date unknown
Last verified: April 2026 · Source: NRC ADAMS / Press Release · Scoring methodology ℹ
Recent Activity
No recent activity on record
Company Profile

ARDP Risk Reduction recipient. BANR design in early development.

VISIT BWXT
Reactor Specs
REACTOR DESIGN
BANR · Gas-Cooled Microreactor

Uses helium gas as coolant instead of water. Operates at higher temperature for greater thermal efficiency.

POWER OUTPUT
50 MWe

Powers ~40,650 average US homes. A standard large nuclear plant produces ~1,000 MWe.

COOLANT
Helium

Inert gas that cannot become radioactive. Allows very high outlet temperatures for industrial heat applications.

FUEL TYPE
TRISO

Tristructural isotropic fuel: uranium encased in ceramic layers that cannot melt. Each particle acts as its own micro containment vessel.

TARGET OPERATION
2034

US nuclear projects historically require 7–10 years from construction permit to first power. The 2034 target assumes factory-built modular components and no major regulatory delays.

SITE LOCATION
TBD

Site not yet selected. Selection typically occurs 2–3 years before license application, driven by grid capacity, water access, and state regulatory climate.

Licensing Milestone Tracker
PRE-APPLICATION
APPLICATION
UNDER REVIEW
RAI RESOLVED
DESIGN CERTIFIED
CONSTRUCTION PERMIT
NRC Regulatory Journey
0 DOCUMENTS · SOURCE: NRC ADAMS · NO DOCKET FILED
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync
PENDING
Document data pending pipeline sync